Technology 8
Mr. Bucci
Bridge
Building
Scenario:
As a civil engineer working for the New York State Transportation Department,
you are responsible for designing and building a bridge that will carry a two
lane highway over the Hudson River from Haverstraw to
Ossining. Your task is to build a model and test its structure to
ensure it is safe for operation.
Performance
Objectives:
Students will be
able to:
-
Generate ideas
and design solutions to solve problems through sketches, drawings, and
notes.
-
Estimate, make,
and use measurements in a technological project.
-
Manage time and
resources in a technological project.
-
Identify the
components of a system (members, joints, load, deck, footing, etc.)
-
Understand
forces exerted on members such as compression and tension.
Materials:
Balsa wood, wood glue, paper, graph paper.
Tools:
Ruler, scissors, stick cutter, pliers.
Constraints:
-
Bridge must
span 10” in length, (no less, no more).
-
Bridge width is
up to designer.
-
Maximum height
of 5”, minimum of 1”.
-
Bridge must
only be constructed using materials given above.
-
Bridge must be
capable of hooking weight onto the center of bridge.
Due Date:
_______________________